Archive for May 11th, 2008

Bruce Engineered Floor – Subfloor Prep for Glue Down Install

May 11, 2008

Q: I am installing a Bruce engineered hardwood floor over a concrete slab. When the house was built and the base board was painted, the painters left quite a bit of overspray on the concrete slab. Does this overspray need to be removed so that the glue will adhere properly to the slab. My...
Read more »

Posted in Engineered Hardwood, installation | No Comments »

Flooring Sponsors: